Collaboration
Miratek Elektrik maintains an ongoing engineering partnership with Armagan Muhendislik on electrical design, medium voltage (MV) cable line installation and transformer substation refurbishment for power plants and industrial facilities. The collaboration spans an end-to-end scope, from the design of in-plant power distribution infrastructure to on-site MV cabling and the standards-compliant renewal of existing transformer substations. With its industrial electrical contracting track record and MV system expertise up to 35 kV, Miratek combines the engineering strength of both companies on joint projects.
Challenge
In projects at power plant scale, the electrical infrastructure must simultaneously satisfy continuous power demand, high reliability expectations and full compliance with TEDAS/EMRA (EPDK) regulations and IEC standards. Refurbishing existing transformer substations is a delicate process that must be carried out without disrupting the facility's power continuity. Selecting the correct routes for MV cable lines, producing designs verified by short-circuit and voltage drop calculations, and ensuring the site implementation matches the design exactly constitute the project's most critical engineering challenges.
The Miratek Solution
In coordination with Armagan Muhendislik, Miratek addressed the plant's electrical infrastructure end to end. Design work was completed on the basis of single-line diagrams, load flow and short-circuit analyses; MV cable lines were planned with the correct cross-sections and routes and installed in the field. Transformer substation refurbishments, MV switchgear cubicle renewal and protection relay coordination were executed in phases to preserve the facility's power continuity. All work was delivered with complete technical documentation, in accordance with IEC standards, TEDAS/EMRA (EPDK) regulations and ISO 9001:2015 quality processes.
Results
- Plant electrical infrastructure designed and implemented in the field in full compliance with standards
- Transformer substation refurbishments completed while preserving power continuity
- MV cable lines commissioned safely and reliably
- An ongoing, trust-based collaboration combining the engineering competence of both companies
Project Scope
- Power plant electrical design and single-line diagram engineering
- Medium voltage (MV) cable line routing and installation
- Transformer substation refurbishment and MV switchgear cubicle renewal
- Protection relay coordination and commissioning support
- Grounding and lightning protection systems
- Standards compliance and technical documentation
Related Services
Proje Galerisi


Sıkça Sorulan Sorular
In which areas do Miratek and Armagan Muhendislik collaborate?+
The collaboration primarily covers power plant electrical design, medium voltage (MV) cable line installation and transformer substation refurbishment. End-to-end engineering services, from design to site implementation and commissioning, are carried out jointly.
Does transformer substation refurbishment shut down the facility?+
No. With phased planning, temporary supply solutions and correct timing, transformer substation refurbishments can be carried out while preserving the facility's power continuity. Critical transitions are engineered in advance and executed in a controlled manner.
To which standards are medium voltage cable lines installed?+
MV cable lines are designed on the basis of correct cross-section and route selection, verified by short-circuit and voltage drop calculations. Implementation is carried out in accordance with the relevant IEC standards and TEDAS and EMRA (EPDK) regulations.
Up to which voltage levels does Miratek serve in MV systems?+
Miratek has expertise in medium voltage systems in the 1 kV–35 kV range and provides turnkey contracting services within this scope for power plant and industrial facility projects.