Automatic Transfer Panels
Low Voltage Panel Services

Panel Manufacturing

Automatic Transfer Panels

Automatic transfer switch (ATS) panels shift loads to a generator or standby source during a grid outage without human intervention. In operations that cannot tolerate an interruption — healthcare facilities, data centers, cold chains, or continuous production — the reliability of the transfer system means business continuity itself. A badly structured transfer scenario can leave the facility in the dark even when the generator is sound.

Miratek designs the transfer panel together with load prioritization and generator capacity; which loads are backed up and which are shed is settled at the design stage. Electrical and mechanical interlocking prevents the two sources from clashing at the hardware level. At commissioning, real outage scenarios are tested and the system is handed over in working order.

Technical Scope Summary

Voltage level400 V LV
Transfer typeMotorized changeover switch or contactor-based transfer arrangements
Source schemeMains-generator, mains-mains, and multi-source scenarios
InterlockingElectrical and mechanical interlocking to prevent source clash
Application areasHealthcare facilities, data centers, cold storage warehouses, continuous production lines
Delivery modelTurnkey including design, manufacturing, installation, and scenario testing

How We Work

1

Site survey and load prioritization

The loads to be backed up, the generator capacity, and the transfer scenario are determined in place.

2

Design

The transfer architecture, interlocking scheme, and control scenarios are approved on the design.

3

Manufacturing

The ATS panel is manufactured in the workshop, and functional tests are completed in the factory environment.

4

Site installation

The panel is installed, and the power and generator control connections are made.

5

Scenario testing and commissioning

Real outage scenarios are applied; transfer and return behaviour is verified and reported.

Scope of Work

  • Design and manufacturing of mains-generator and mains-mains transfer panels
  • Structuring of load prioritization and load shedding scenarios
  • Generator control integration and start-stop signalling
  • Electrical and mechanical interlocking systems
  • Site installation and outage scenario testing
  • Periodic testing and maintenance support

Frequently Asked Questions

How quickly does the transfer happen when the mains fails?

The time depends largely on how quickly the generator starts and accepts the load; the transfer panel completes the changeover within seconds once the source is ready. For loads that tolerate no interruption at all, an ATS alone is not enough — it must be paired with a UPS. The design makes this distinction load by load.

Can an ATS panel be added to our existing generator?

It can, provided the generator supports remote start control; the generator control panel is examined during the survey. If there is an incompatibility, the necessary control module revision is brought into scope. The panel is connected to the existing distribution system during a planned outage.

Does maintaining the transfer panel halt production?

A manually controlled bypass arrangement can be added to the panel so that the load remains supplied during maintenance or a fault. This scheme provides energy continuity during maintenance, particularly in operations that run without interruption. The need is evaluated together at the survey stage.

Quick Facts

  • Category: Low Voltage Panel Services
  • Turnkey delivery
  • ISO 9001 quality assurance